Equity · Technology
Keel Infrastructure Corp. (KEEL) perpetual futures
Keel Infrastructure Corp. develops and owns data centers and energy infrastructure for computing workloads, including AI, in North America.
Price chart
Interactive TradingView chart
TradingView symbol NASDAQ:KEEL
Loads TradingView's third-party widget (about 1 MB) on demand.
Trading data
Perpetual market activity
0/1 live markets
Trading data
Perpetual market activity
Spot performance
Best venues for this underlying
Best liquidity
-Tightest spread
-Highest volume
-Next catalyst
Catalysts
Next catalyst
Catalysts
No unusual perp activity right now.
Research data
Analysts, filings and peer context
Research data
Analysts, filings and peer context
Estimates
6Company events
6Peer comparison
Similar listed perpsRevenue mix
Latest annualAnalysts
Price targets in USD| Consensus rating | Buy |
|---|---|
| Average 12-month price target | $5.25 |
| 12-month target range (low – high) | $2 – $8 |
| Ratings in the newest month | 12 |
Rating mix of 2026-11-01 · Price targets as of 2026-11-22
Analyst rating history
Ratings| Month | Strong buy | Buy | Hold | Sell | Strong sell |
|---|---|---|---|---|---|
| Nov 2026 | 1 | 9 | 2 | 0 | 0 |
| Oct 2026 | 2 | 9 | 1 | 0 | 0 |
| Sep 2026 | 2 | 9 | 1 | 0 | 0 |
| Aug 2026 | 2 | 8 | 1 | 0 | 0 |
| Jul 2026 | 2 | 8 | 1 | 0 | 0 |
| Jun 2026 | 2 | 7 | 1 | 0 | 0 |
| May 2026 | 1 | 7 | 1 | 0 | 0 |
| Apr 2026 | 1 | 7 | 1 | 0 | 0 |
| Mar 2026 | 1 | 7 | 1 | 0 | 0 |
| Feb 2026 | 1 | 7 | 1 | 0 | 0 |
| Jan 2026 | 1 | 7 | 1 | 0 | 0 |
| Dec 2025 | 1 | 8 | 0 | 0 | 0 |
Ownership
Institutional · 2026-Q3Reference market activity
KEEL-PERPPrice performance
11Insider activity
FY2026 Q4Insider transactions
25Director Philip Fanny reported an open-market purchase of 4,000 common shares of Keel Infrastructure Corp. at $1.73 per share on 2026-11-19, bringing his holdings to 184,685 shares.
COO Liam Daniel Wilson bought 28,942 common shares of Keel Infrastructure at $1.73 in one open-market purchase on 2026-11-16, raising his holding to 129,920 shares.
Director Amy Freedman bought 40,000 Keel Infrastructure common shares in two open-market purchases: 15,000 at $1.94 and 25,000 at $1.88, leaving 109,568 shares owned.
Keel Infrastructure director Hofmeister Edith bought 15,000 shares of common stock at $1.89 per share on 2026-11-09, bringing her holdings to 255,001 shares.
CEO Benjamin Gagnon bought 38,888 common shares at $3.33 each on August 21, 2026, increasing his holdings to 1,386,624 shares.
COO Liam Daniel Wilson purchased 30,769 common shares of Keel Infrastructure Corp. at $3.25 each, increasing his holdings to 100,978 shares.
COO Liam Wilson purchased 26,472 common shares at $3.78 each on August 17, 2026, increasing his holdings to 70,209 shares.
On August 13, 2026, CEO Benjamin Gagnon purchased 58,888 common shares of Keel Infrastructure Corp. at $3.33 each, increasing his holdings to 1,347,736 shares.
CEO Benjamin Gagnon converted 215,579 RSUs into 215,579 common shares, now holding 1,288,848 shares and 431,159 RSUs.
COO Liam Daniel Wilson converted 76,424 RSUs into 76,424 common shares, then had 32,687 shares withheld for taxes at $4.67 each, leaving 43,737 shares owned.
Marc-Andre Ammann converted 28,480 RSUs into 28,480 common shares, then had 15,183 shares withheld for taxes at $4.67 each, leaving 13,297 shares owned.
Rachel Silverstein (EVP, General Counsel) converted 18,370 RSUs into 18,370 common shares, then 6,837 shares were withheld to cover taxes at $4.67 each.
Keel Infrastructure's President Ganesh Aiyer was granted 259,516 restricted stock units and options to buy 100,000 shares at $4.56 as compensation on 2026-07-09.
Aiyer Ganesh filed an initial Form 3 ownership statement for Keel Infrastructure Corp., reporting no beneficial ownership of common stock as of 2026-07-06.
CEO Benjamin Gagnon was awarded 500,000 stock options ($3.53) and then returned the same 500,000 options to the company, leaving 0 options owned afterward.
Filings
51 · Latest SEC filingsDirector Philip Fanny reported an open-market purchase of 4,000 common shares of Keel Infrastructure Corp. at $1.73 per share on 2026-11-19, bringing his holdings to 184,685 shares.
COO Liam Daniel Wilson bought 28,942 common shares of Keel Infrastructure at $1.73 in one open-market purchase on 2026-11-16, raising his holding to 129,920 shares.
Director Amy Freedman bought 40,000 Keel Infrastructure common shares in two open-market purchases: 15,000 at $1.94 and 25,000 at $1.88, leaving 109,568 shares owned.
Keel Infrastructure director Hofmeister Edith bought 15,000 shares of common stock at $1.89 per share on 2026-11-09, bringing her holdings to 255,001 shares.
CEO Benjamin Gagnon bought 38,888 common shares at $3.33 each on August 21, 2026, increasing his holdings to 1,386,624 shares.
COO Liam Daniel Wilson purchased 30,769 common shares of Keel Infrastructure Corp. at $3.25 each, increasing his holdings to 100,978 shares.
COO Liam Wilson purchased 26,472 common shares at $3.78 each on August 17, 2026, increasing his holdings to 70,209 shares.
On August 13, 2026, CEO Benjamin Gagnon purchased 58,888 common shares of Keel Infrastructure Corp. at $3.33 each, increasing his holdings to 1,347,736 shares.
CEO Benjamin Gagnon converted 215,579 RSUs into 215,579 common shares, now holding 1,288,848 shares and 431,159 RSUs.
COO Liam Daniel Wilson converted 76,424 RSUs into 76,424 common shares, then had 32,687 shares withheld for taxes at $4.67 each, leaving 43,737 shares owned.
Marc-Andre Ammann converted 28,480 RSUs into 28,480 common shares, then had 15,183 shares withheld for taxes at $4.67 each, leaving 13,297 shares owned.
Rachel Silverstein (EVP, General Counsel) converted 18,370 RSUs into 18,370 common shares, then 6,837 shares were withheld to cover taxes at $4.67 each.
Keel Infrastructure's President Ganesh Aiyer was granted 259,516 restricted stock units and options to buy 100,000 shares at $4.56 as compensation on 2026-07-09.
Aiyer Ganesh filed an initial Form 3 ownership statement for Keel Infrastructure Corp., reporting no beneficial ownership of common stock as of 2026-07-06.
CEO Benjamin Gagnon was awarded 500,000 stock options ($3.53) and then returned the same 500,000 options to the company, leaving 0 options owned afterward.
Keel Infrastructure director Brian Howlett was awarded 101,010 Restricted Stock Units on 2026-04-02 as compensation (not a purchase), bringing his holding to 101,010 units.
Director Wayne Duso was granted 101,010 Restricted Stock Units in Keel Infrastructure Corp. on 2026-04-02, an award rather than a purchase. He now owns 101,010 shares.
Keel Infrastructure EVP & General Counsel Rachel Rose Silverstein was granted 267,638 Restricted Stock Units (a compensation award, not a market purchase), bringing her holding to 267,638 shares.
Director Andrew Chang was granted 101,010 Restricted Stock Units at Keel Infrastructure Corp. on 2026-04-02, bringing his total holdings to 101,010 units. This was a compensation award, not an open-market purchase.
Director Amy Freedman was granted 101,010 Restricted Stock Units on 2026-04-02, a compensation award rather than an open-market purchase, bringing her holdings to 101,010 units.
Marc-Andre Ammann, Principal Accounting Officer of Keel Infrastructure Corp., was granted 267,638 Restricted Stock Units on 2026-04-02, bringing his post-grant holdings to 267,638 units. This was a compensation award, not an open-market purchase.
Keel Infrastructure COO Liam Daniel Wilson was granted 743,438 Restricted Stock Units on 2026-04-02, bringing his post-grant holdings to 743,438 shares. This was a compensation award, not an open-market purchase.
Keel Infrastructure CEO and director Benjamin Gagnon was awarded 1,665,300 Restricted Stock Units on 2026-04-02, bringing his total holdings to 1,665,300 shares. This was a compensation grant, not an open-market purchase.
Keel Infrastructure's CFO Mir Jonathan was granted 743,438 Restricted Stock Units on 2026-04-02, bringing his total holding to 743,438 shares. This was a compensation award, not an open-market purchase.
Director Edith Hofmeister was granted 101,010 Restricted Stock Units in Keel Infrastructure Corp. as compensation on 2026-04-02, bringing her ownership to 101,010 units.
Keel Infrastructure director Philip Fanny was awarded 101,010 Restricted Stock Units on 2026-04-02 as compensation, bringing his post-transaction holding to 101,010 units.
Keel Infrastructure director Andrew Chang filed a Form 3 on 2026-04-01 reporting 178,685 common shares and 210,000 stock options (right to buy) at $1.87, with no shares transacted.
Initial Form 3 for Rachel Rose Silverstein, General Counsel, Global, of Keel Infrastructure Corp.: she reports holdings of 145,000 stock options (right to buy, $2.18 strike), 55,109 restricted stock units and 1,390 common shares.
Keel Infrastructure Corp. COO Liam Daniel Wilson filed an initial Form 3 on 2026-04-01 reporting holdings: stock options to buy at $2.18-$2.20 and 229,273 restricted stock units. No open-market purchases or sales were reported.
Keel Infrastructure CFO Jonathan Mir filed a Form 3 reporting 250,000 stock options (right to buy) at a $4.21 exercise price.
Keel Infrastructure officer Ammann Marc-Andre filed an initial Form 3 reporting holdings of 310,000 stock options (exercise prices $1.83-$2.66) and 85,441 restricted stock units.
Keel Infrastructure director Philip Fanny filed Form 3 on 2026-04-01, reporting 180,685 common shares and 210,000 stock options (exercise prices $1.87-$2.20) held after the reported acquisitions, which involved 0 shares each.
Keel Infrastructure Corp. director Duso Wayne filed a Form 3 on 2026-04-01, reporting 0-share stock option holdings (right to buy) at a $1.26 price, with 150,000 options owned afterward. No purchase, sale or award was reported in the filing.
Transcripts
Earnings callsFY2026 Q12026-05-11
Earnings calls
AI summary
positiveOn its first earnings call as Keel Infrastructure, the company outlined plans to sign three leases by year-end 2026 at Panther Creek, Sharon and Moses Lake, with revenue expected to commence in 2027. Q1 2026 revenue from continuing operations was $37 million, down 23% year-over-year, with an operating loss of $98 million. The company reported roughly $533 million in cash and Bitcoin liquidity as of May 8, 2026, which it said fully funds advancement of the three sites through lease execution, initial construction at Moses Lake, and G&A through 2028. Zoning is complete at all three near-term sites, with land development and environmental permits on track for a mid- to late summer time frame. Management also discussed Scrubgrass, where a detailed load study covers 750 megawatts and results are expected around Q4.
Key takeaways
- Keel plans to sign three leases by year-end 2026, one each at Panther Creek, Sharon and Moses Lake, and expects revenue to begin in 2027.
- Zoning approvals are complete at all three near-term sites, and land development and environmental permits are on track for a mid- to late summer time frame.
- Panther Creek has 350 megawatts of secured capacity under an ESA with PPL; management is evaluating converting a 60-megawatt ISA to firm service, which could bring total gross capacity to roughly 400 to 430 megawatts.
- Moses Lake has also secured an option for an additional 10 megawatts nearby, and all key modular equipment, transformers and backup gens have been procured.
- Bitcoin mining stands at about 14 exahash and is expected to decline to roughly 5 exahash by year-end as sites are decommissioned.
Financial highlights
- Q1 2026 revenue from continuing operations was $37 million, down 23% year-over-year.
- Q1 2026 operating loss was $98 million, including $28 million of noncash depreciation.
- Loss from continuing operations was $128 million, or $0.21 per basic and diluted share.
- Adjusted EBITDA was negative $17 million for Q1 2026, and liquidity was approximately $533 million in cash and Bitcoin as of May 8, 2026.
Guidance
- Company targets signing three leases by year-end 2026, with revenue commencing in 2027 and expected ready-for-service dates as early as 2027.
- Run-rate cash SG&A is expected to be about $25 million per quarter, or $100 million a year, plus or minus.
- Bitcoin mining is expected to decline from about 14 exahash to roughly 5 exahash by the end of the year.
- Management said liquidity covers the capital needed to advance the three sites through lease execution, start construction at Moses Lake, and fund G&A through 2028.
Q&A themes
- Tenant mix trade-offs between hyperscalers and neoclouds, balancing economics, credit quality and cost of capital
- Permitting time lines remaining on track for mid- to late summer, with lease negotiations proceeding in parallel
- Pricing dynamics expected to improve as power scarcity worsens, without committing to specific lease economics
- Scrubgrass 750-megawatt load study results expected around Q4 and efforts to move megawatts into the secured bucket
Risks
- Permitting time lines could move slightly faster or slower, though management expressed high confidence in a mid- to late summer time frame.
- Demand may be affected by geopolitical uncertainty and questions around global versus U.S. investment in HPC and AI infrastructure.
- Management identified bandwidth as the biggest gating factor for executing a 2-gigawatt development pipeline.
FY2025 Q42026-03-31
Earnings calls
AI summary
positiveBitfarms rebranded as Keel Infrastructure effective April 1, 2026, pivoting entirely from Bitcoin mining to develop HPC and AI data center infrastructure across Pennsylvania, Washington, and Quebec. The company secured $520M in liquidity, retired legacy debt, and assembled experienced leadership to advance three primary development sites (Panther Creek, Sharon, Moses Lake) through permitting and lease execution in 2026, with revenue generation expected in 2027. Management emphasized that investment-grade customers value derisked sites and will require NTP before binding lease commitments.
Key takeaways
- Redomiciliation to U.S. and rebrand to Keel Infrastructure completed; trading under ticker KEEL on Nasdaq and TSX starting April 3, 2026
- 2.2 GW secured pipeline across Pennsylvania (350 MW Panther Creek ESA + 60 MW ISA conversion opportunity), Washington (18 MW), and Quebec expansion capacity; approximately 1.5 GW is expansion capacity with limited market valuation
- Shifted from GPU-as-a-service model to pure co-location infrastructure; permitting expected in coming months across all three major sites with lease execution targeted for 2026
- $520M liquidity as of March 27, 2026 funds development through lease execution; no material capital raise anticipated before permitting and leasing milestones
- Bitcoin mining operations continue on disciplined exit basis with marginal profitability; no new investments planned; hash rate expected to decline through 2026 as sites require preparation for construction
Financial highlights
- FY2025 revenue $229M, up 72% YoY from continuing operations (Paraguay Paso Pe classified as held for sale)
- FY2025 operating loss $150M including $98M noncash depreciation and $28M impairment; net loss $209M or ($0.38) per share vs. 2024 net loss of $7M
- Adjusted EBITDA FY2025 was $29M vs. $31M in 2024
- $588M oversubscribed convertible offering and February 2026 repayment of Macquarie debt facility eliminated legacy covenants and strengthened balance sheet
Guidance
- 2026: Complete permitting across Panther Creek, Sharon, and Moses Lake (expected mid-to-late summer); execute lease agreements with investment-grade tenants; accelerate Bitcoin wind-down
- 2027: Facilities come online; begin delivering megawatts to customers; HPC/AI revenue generation commences; establish Keel as proven regional infrastructure developer
- Panther Creek expansion: ISA-to-ESA conversion expected in 2026 (regulatory matter, no CapEx); utility exploring additional generation to support 2-3 year timeline for capacity beyond 350 MW
- Lease economics improving; companies with signed leases trading at $4-6M per 2027 MW vs. current valuation of ~$1.9M per 2027 MW
Q&A themes
- GPU-as-a-service decision: Shifted to pure co-location after customer conversations clearly indicated colocation as most accretive model across all sites; no material timing impact from business model change
- Lease execution strategy: Patient approach to maximize long-term NOI and multiples; NTP required by investment-grade counterparties before binding commitment; permits closing condition rather than starting condition to negotiations
- Vera Rubin hardware: Sites designed for highest-level equipment coming in 2027-2028; supply chain not expected to be constraining factor given power remains primary bottleneck
- Mining operations: Profitable but marginal; not impacting 2026 development or operations plans; disciplined exit maximizes free cash flow before capital redeployment
Risks
- Permitting timelines uncertain and vary by jurisdiction; delays could impact lease execution and facility delivery schedules expected for 2026-2027
- Lease execution dependent on customer conversations and negotiations with no binding commitments disclosed; risk of demand softening or customer negotiations taking longer than anticipated
- Expansion capacity (1.5 GW of 2.2 GW pipeline) assigned little market value and requires securing additional power generation and transmission capacity with 2-3 year timelines outside company control
FY2025 Q32025-11-13
Earnings calls
AI summary
positiveBitfarms announced a $128 million fully funded binding agreement to convert its 18-megawatt Washington site to HPC/AI workloads by December 2026, with plans to pursue GPU-as-a-service as a monetization strategy. The company is strategically delaying Phase 1 at Panther Creek to design for NVIDIA's next-generation Vera Rubin GPUs (370 kW/rack vs. 190 kW for GB300s) rather than Blackwell, betting that infrastructure incompatibility will drive premium lease rates of $150-180/kW/month by 2027. With $1 billion+ in available capital (including $588M raised via convertible notes), Bitfarms is well-capitalized to fund development across Pennsylvania, Quebec, and Washington sites while maintaining mining operations generating ~$8M monthly free cash flow.
Key takeaways
- Announced $128M fully funded infrastructure agreement for Washington site conversion targeting December 2026 completion with 1.2-1.3 PuE efficiency
- Strategic pivot to develop 99% of 2026-2027 portfolio for Vera Rubin GPUs (370 kW/rack) instead of Blackwell, expecting infrastructure incompatibility to command premium lease rates
- Delaying Panther Creek Phase 1 from December 2026 to H1 2027 to accommodate Vera Rubin design; expanded power potential to 410-500+ MW announced
- Evaluating GPU-as-a-service at Moses Lake/Washington site expected to generate more annual NOI than entire Bitcoin mining business history
- Quebec confirmed ability to convert 170 MW Bitcoin mining to HPC/AI in October; planning Sherbrooke facility development for 96 MW with regional campus strategy
Financial highlights
- Q3 2025 revenue $84M from continuing/discontinued operations; continuing operations revenue $69M (+156% YoY)
- Q3 continuing operations: 520 BTC mined, gross mining margin 35%, average direct cost $48,200/BTC, all-in cost $82,400/BTC
- Q3 adjusted EBITDA from continuing operations $20M (28% of revenue) vs. $2M (8%) in Q3 2024
- War chest of $1.0B+ comprised of $820M cash/Bitcoin plus $200M available from Macquarie facility
Guidance
- Washington site targeted for completion December 2026; Sharon full 110 MW online by year-end 2026 with revenue ramp H1 2027
- Panther Creek Phase 1 energization delayed from December 2026 to H1 2027; Phase 2 timeline unaffected; Phase 3-4 capacity to 410+ MW subject to regulatory approval
- Scrubgrass potential 1.3 GW capacity earliest implementation around 2028 following detailed load studies and natural gas pipeline evaluation
- CapEx figures for 2026 to be clarified in Q1 pending NVIDIA Vera Rubin validated reference design completion (expected Q1, GPU production Q2 2026)
Q&A themes
- Vera Rubin economics: 370 kW/rack vs. 190 kW for GB300s creates infrastructure incompatibility; suppliers economically incentivized to pay premiums ($140-180/kW/month guidance) rather than hold unutilized GPUs with 80-90% margins
- GPU-as-a-service financing: OEM manufacturers offer attractive financing programs; targeting Q4 2026 completion; high confidence in sourcing GPUs on timely basis
- Regional campus strategy in Quebec: 90-minute proximity between sites enables <2ms latency with direct fiber; Amazon-pioneered model applicable to 170 MW Montreal cluster
- Pennsylvania power expansion: ISA-to-ESA conversion at Panther Creek could occur quickly pending regulatory approval; Tennessee Natural Gas Pipeline (550 MW capacity) evaluation for Scrubgrass on-site generation
Risks
- Vera Rubin GPU reference designs not yet finalized by NVIDIA; CapEx estimates uncertain pending Q1 2026 design completion; could impact project timelines and costs
- Construction bottlenecks on critical path across multiple sites (Washington, Sharon, Panther Creek) could delay completion timelines beyond stated 2026-2027 targets
- GPU-as-a-service strategy at Washington is new; early-stage customer conversations and no firm contracts yet; execution risk on monetization and financing terms
FY2025 Q22025-08-12
Earnings calls
AI summary
positiveBitfarms generated $78M in Q2 revenue (up 87% YoY) and $32M in gross mining profit with a 45% direct mining margin, while establishing a strategic pivot to HPC and AI infrastructure development. The company secured $300M in Macquarie financing for its flagship Panther Creek Pennsylvania campus, targeting 50MW operational by end-2026 and 350MW total capacity by 2027, supported by confirmed grid capacity and partnership with developer T5. With $230M in total liquidity, approximately $8M monthly free cash flow from mining, and execution of a 49.9M share buyback program, Bitfarms is advancing its transition to a U.S.-focused energy and compute infrastructure company.
Key takeaways
- Q2 mined 718 BTC at $48,200 direct cost per BTC with $98,000 revenue per BTC and 45% mining margin; announced Argentina facility shutdown by Nov 11, 2025 expected to generate ~$18M in proceeds
- Panther Creek Phase 1 (50MW) confirmed for end-2026 with PPL grid connection; Phase 2 (300MW) targeted for 2027; total build-out estimated at $400M CapEx with $10.5M planned for remainder of 2025
- Secured $300M Macquarie financing facility ($50M drawn at closing for design/development; $250M project finance tranche drawable upon milestones); engaged T5 as development partner covering design, engineering, construction and operations
- Portfolio rebalanced to 80%+ North American megawatts; announced U.S. GAAP transition for FY2025 and planned 2026 U.S. redomicile; launched first-ever share buyback program targeting up to 49.9M shares (~9% outstanding) with 4.9M repurchased in first 2 weeks
- Bitcoin holdings increased to ~1,200 BTC (up 25% from year-end 2024) valued at ~$145M; Quebec conversion to HPC tentatively planned for 2027-2028; Washington 18MW site positioned for enterprise customer contracts
Financial highlights
- Q2 2025 total revenue: $78M (up 87% YoY); mining revenue: $71M; hosting/other revenue: $7M
- Q2 gross mining profit: $32M; direct mining cost per BTC: $48,200; all-in cash cost: $77,100; profit per BTC: $20,900
- Q2 adjusted EBITDA: $14M (18% of revenue); cash G&A: $18M; operating loss: $40M including $15M Argentina impairment; net loss: $29M ($0.05 per share)
- Total liquidity as of Aug 11: ~$230M (cash and unencumbered BTC); projected $8M monthly free cash flow from mining operations; Bitcoin One program profits: $11M since Feb 2025
Guidance
- Panther Creek Phase 1: 50MW confirmed operational by end-2026; Phase 2: 300MW as early as 2027; total campus expansion to 350-410MW with Phase 3 potential
- Projected $8M monthly free cash flow from mining operations expected throughout remainder of 2026 to fund CapEx, debt service, and share buybacks
- Panther Creek CapEx: ~$10.5M for remainder of 2025; ~$400M total for full build-out through 2026; Macquarie $250M tranche expected drawable in 2026 pending milestone approvals
- Quebec portfolio conversion tentatively planned for 2027-2028 pending regulatory approval; no clearly defined regulatory pathway currently exists for converting crypto mining megawatts to data center megawatts
Q&A themes
- Panther Creek development proceeding with civil works and substation construction in coming months; building construction to begin in early 2026; T5 managing permitting, procurement and execution; no customer contracts required to commence development
- Customer conversations actively underway but timeline dependent on large enterprise customer due diligence processes; first HPC revenue likely in 2027 pending contract finalization; power availability and delivery certainty by mid-2026 are key conversation drivers
- T5 selected through competitive bidding process for build quality, hyperscaler relationships, full-service offering (design through operations), and competitive pricing; anticipated to provide value through on-time/on-budget delivery
- Pennsylvania tailwinds accelerating customer interest given $90B+ regional investment commitments from Google, Meta, Blackstone, Brookfield, and CoreWeave validating development potential; Scrubgrass expansion beyond 500MW under evaluation as secondary growth priority after Panther Creek execution
Risks
- Quebec conversion requires regulatory approval with no clearly defined pathway; timing uncertain despite broad political support; potential delays could extend beyond 2027-2028 timeline
- HPC customer contracts remain in negotiation phase; no binding term sheets disclosed; customer decision timelines uncertain and dependent on enterprise procurement processes
- Argentina facility shutdown reduces hash rate; electric supply negotiations remain ongoing with no visible pathway to reenergization despite recent government incentive changes
Company news
Reuters, WSJ, Bloomberg and FT first, as far as our news provider delivers them; other publishers behind the second filter. Headlines link to the publisher.No articles from Reuters, WSJ, Bloomberg or FT for this company in our feed.
Company data
Company intelligence
Updated: Nov 22, 2026, 10:00 AM UTC
Company data
Company intelligence
Company profile
- Sector
- Technology
- Industry
- Information Technology Services
- Chief executive
- Benjamin J. Gagnon
- Employees
- 274
- IPO date
- Aug 16, 2019
- Country
- US
- Exchange
- NASDAQ
Rating factors
- Return on equityi
- 1/5
- Return on assetsi
- 1/5
- Debt to equityi
- 1/5
- Price to earningsi
- 1/5
- Price to booki
- 1/5
Company press releases
Market cap history
Largest fund holders
| Fund | Weight | Shares held |
|---|---|---|
| IWM | 0.06% | 15.6M |
| FSSNX | 0.11% | 10.8M |
| ANNPX | 0.53% | 10.5M |
| VTI | 0% | 7.7M |
| VXF | 0.02% | 6M |
| VB | 0.01% | 5.5M |
| BCHN.L | 1.6% | 5.4M |
| WGMI | 6.02% | 5M |
| IWN | 0.09% | 4.1M |
| VBR | 0.02% | 3.5M |
| VTWO | 0.06% | 3.4M |
| FSMAX | 0.03% | 3M |
Analyst track record
How the analysts covering KEEL have done: ratings, price-target accuracy and the measured reaction after their calls.
| 12 months | 3 years | |
|---|---|---|
| Ratings | 32 | 91 |
| Analysts | 15 | 21 |
| Buy / hold / sell | 26 / 6 / 0 | 83 / 8 / 0 |
| Upgrades / downgrades / initiations | 0 / 1 / 5 | 2 / 2 / 14 |
| Price targets hit / missed | 0 / 30 (0%) | 0 / 89 (0%) |
| Avg. return after a rating (TipRanks) | -61.2% | -57.4% |
| Best / worst call | -14.5% / -82.9% | -14.5% / -82.9% |
After buy calls on this stock: median 21-day move -5.8% vs S&P 500 -4.8% (n = 84)
Most accurate on this stock
Share of an analyst's price targets on this stock that the price reached within 12 months (our measurement over the last 3 years, at least 8 targets). It describes past calls, not the odds of the current one.
- Mike ColonneseH.C. Wainwright50% hit rate on this stock · 14 targets measuredBuytarget $3.25Nov 5, 2026
- Michael GrondahlNorthland Securities50% hit rate on this stock · 10 targets measuredBuytarget $7.00Aug 11, 2026
Latest ratings
| Date | Analyst | Call | Target | |
|---|---|---|---|---|
| Nov 6, 2026 | Michael NgGoldman SachsNov 6, 2026 | HoldInitiated | $2.00↗ | article ↗ |
| Nov 5, 2026 | Brett KnoblauchCantor FitzgeraldNov 5, 2026 | BuyReiterated | $4.00↗ | article ↗ |
| Nov 5, 2026 | Brian KinstlingerAlliance Global PartnersNov 5, 2026 | BuyMaintained | $3.50↗ | article ↗ |
| Nov 5, 2026 | Mike ColonneseH.C. WainwrightNov 5, 2026 | BuyReiterated | $3.25↗ | article ↗ |
| Nov 2, 2026 | Stephen GlagolaKBWNov 2, 2026 | HoldMaintained | $3.00↗ | article ↗ |
Share of analysts per call each month (latest call per analyst within 180 days). Targets and closes in USD.
TipRanks data · computed Nov 20, 2026 · 32 ratings
BingX